Wunghnu Solar Farm

Grand Solar Construction

BP Lightsource

Feb 2024 - Nov 2024

Walla Walla, NSW

6

Civil works:

  • Trenching, conduiting, and backfilling of HV conduits and LV control conduits
  • Installation of structural footings (including FRP)
  • Installation of gates and signage

Electrical works:

  • Installation of HV 33 kV underground cable
  • Terminations of HV cable
  • Installation of secondary control cables and terminations
  • Testing and commissioning of all associated equipment
  • Installation of 33 kV primary switchgear
  • Installation of harmonic filters (10.7 MVAr)

Final works:

  • HV switching
  • Energisation
  • Commissioning

O&M

  • Operation and Annual Maintenance