Walla Walla Substation
Green Grid Connect
Grand Solar
May 2024 - Nov 2024
Walla Walla, NSW
20
Civil Works
- Trenching and installation of conduits and fibre pathways.
- Construction of harmonic filter pads and building footings.
- Form, reinforcement, and placement works for all switchgear foundations.
- Installation of fencing, gates, signage, and sunroof.
Electrical Works
- Installation of eight 33kV harmonic filters (10.7 MVar each).
- Installation of 33kV underground cables and associated switchgear.
- Installation of the control building and switch room.
- Secondary systems wiring, SCADA control, and automation.
- System interface between Transgrid and Grand Solar.
- Terminations into Transgrid’s Walla Walla Substation.
Commissioning
- Full testing and commissioning of the substation and systems to achieve operational readiness.
Similar Projects
Wunghnu Solar Farm
Civil works:Trenching, conduiting, and backfilling of HV conduits and LV ...
Walla Walla Substation
Civil Works Trenching and installation of conduits and fibre pathways. ...
Wollar Solar Farm
Milspec Energy was engaged by Sunterra as a subcontractor ...
Deer Park Substation
The scope of work included: Civil Works Construction of switch ...