Deer Park Substation
TEC-C
Transgrid
Feb 2025 - Sept 2025
Ravenhall, Victoria
8
The scope of work included:
Civil Works
- Construction of switch bay Landing foundations.
- Concrete form, reinforcement, and placement works.
- Structural footings and associated yard works.
Electrical Works
- Installation of 66kV underground cables and primary switchgear.
- Switchbay assembly and equipment installation.
- Secondary systems, protection wiring, and SCADA integration.
- Terminations and interface with existing Transgrid assets.
- String and Termination of High Voltage Conductors
Commissioning
- Vendor system testing and commissioning of the upgraded 66kV switchbays.
- Pre Commission Testing of All yard plant and equipment
Similar Projects
Walla Walla Substation
Civil Works Trenching and installation of conduits and fibre pathways. ...
Wollar Solar Farm
Milspec Energy was engaged by Sunterra as a subcontractor ...
Wellington Solar Farm
Milspec Energy Solutions was engaged as a subcontractor for ...
Wunghnu Solar Farm
Civil works:Trenching, conduiting, and backfilling of HV conduits and LV ...