Wellington Solar Farm
Grand Solar Construction
BP Lightsource
Jan 2024 - Feb 2024
Wellington , NSW
30
Milspec Energy Solutions was engaged as a subcontractor for the installation of four (4) 33 kV 10.7 MVAR harmonic filter bays within the existing live 330 kV Wellington Substation.
The works involved the complete construction and commissioning of four individual bays, including:
- Civil modifications to existing structures and foundations to accommodate the new harmonic filter equipment.
- Alterations and extensions to the existing earth grid to integrate the new installations safely within the live substation environment.
- Installation of all primary and secondary equipment associated with each harmonic filter bay.
- Full turnkey delivery, encompassing construction, electrical and mechanical installation, testing, and commissioning in accordance with Transgrid standards and operational requirements.
These works were executed under live substation conditions, requiring strict adherence to safety, access, and operational protocols to ensure zero disruption to the 330 kV network.
Works Breakdown:
- Mechanical and Civil Alterations for installation
- Terminations of HV Conductor
- Installation of secondary control cables and terminations
- Testing and commissioning of all associated equipment
- Installation of 33 kV primary switchgear
- Installation of harmonic filters 4 x (10.7 MVAr)
- HV switching
- Energisation
- Commissioning of Harmonic Filters
Similar Projects
Wollar Solar Farm
Milspec Energy was engaged by Sunterra as a subcontractor ...
Wellington Solar Farm
Milspec Energy Solutions was engaged as a subcontractor for ...
Deer Park Substation
The scope of work included: Civil Works Construction of switch ...
Walla Walla Substation
Civil Works Trenching and installation of conduits and fibre pathways. ...