Deer Park Substation
TEC-C
Transgrid
Feb 2025 - Sept 2025
Ravenhall, Victoria
8
The scope of work included:
Civil Works
- Construction of switch bay Landing foundations.
- Concrete form, reinforcement, and placement works.
- Structural footings and associated yard works.
Electrical Works
- Installation of 66kV underground cables and primary switchgear.
- Switchbay assembly and equipment installation.
- Secondary systems, protection wiring, and SCADA integration.
- Terminations and interface with existing Transgrid assets.
- String and Termination of High Voltage Conductors
Commissioning
- Vendor system testing and commissioning of the upgraded 66kV switchbays.
- Pre Commission Testing of All yard plant and equipment
Similar Projects
Deer Park Substation
The scope of work included: Civil Works Construction of switch ...
Wunghnu Solar Farm
Civil works:Trenching, conduiting, and backfilling of HV conduits and LV ...
Wollar Solar Farm
Milspec Energy was engaged by Sunterra as a subcontractor ...
Wellington Solar Farm
Milspec Energy Solutions was engaged as a subcontractor for ...